Spanning the gentle flow of the River Tweed in the heart of Peebles, the Tweed Bridge is more than just a crossing; it’s a living piece of history. With its graceful stone arches and layered structure, it tells a story of centuries, change, and community.
Origins & Early History
Although the exact date the foundations were laid is not known, the oldest surviving records indicate that by 1465, “bridge‑work” was underway at this site. Whether that was a major repair, reconstruction, or the erection of a new stone bridge is unclear, but that date is often used as a benchmark for the bridge’s medieval origins
Local tradition suggests that the first substantial stone version may date back to around 1485, replacing an earlier wooden structure
It’s possible that a master mason known only as John of Peebles was involved in its early construction.
How Big Was the Original?
The bridge was originally very narrow, about 8 feet (2.4 metres) wide—enough for a horse and cart. It carried the road and foot traffic, and for centuries, it was the only crossing on the Tweed in the Peebles area above Kelso.
Changes Over Time
Over the centuries, as traffic and the needs of the town grew, so too did the bridge:
It was rebuilt or heavily repaired in 1663, using stone from St Andrew’s Church, which itself had been destroyed in 1549.
In 1799, three additional arches were added on the south end. These were later replaced when a railway line was built along that side.
The first expansion took place in 1834, widening both sides with the width expanding from about 8 ft to 21 ft.
A further widening between 1897‑and 1900, again on the downstream side, brought it to its current width of 40 feet.
What We Don’t Know – Is when the foundations were laid.
Despite these many records, there is no documented precise date for when the foundations were laid for the stone version of the bridge. The earliest reference date is around 1465‑- 1470, but nothing survives that we know of that identifies a foundation stone or ceremony with a definitive date.
So, while “mid-15th century” is the accepted time frame, and local tradition sometimes uses “about 1485”, neither can be confirmed with absolute certainty.
Why It Matters
What makes the Tweed Bridge special is its continuous evolution. Instead of being replaced, it has been adapted. Its width has changed, its arches have been added and removed, its structure repaired—but through it all, it remains the same crossing, the same vital link, connecting people, commerce, and community.
So, when you walk across it, or pause beneath one of its arches to look at the river flowing by, you’re touching something old—but also something very much alive!